News

Bismarck’s sanitary sewer system is a vast wastewater collection system that includes 300 miles of pipe and 23 lift stations.
Sanitary sewer overflows, SSOs, are a release of untreated or partially treated waste from a city sewer. ... In a combined sewer system, one pipe carries wastewater and stormwater together.
City manager Bart Bartkowiak said the city received notice Wednesday of a $7.25 million low-interest loan from the Texas ...
So, while the cast iron pipe itself has not changed much over the years, the effluent being introduced into the soil pipe has changed dramatically. Cast iron systems today are required to convey ...
This situation may contribute to sewer-related issues in the downtown St. Thomas area and could potentially result in a ...
At about 11 p.m. June 8, Palm Bay Utilities staff discovered a break in a sanitary sewer force main at 1050 Clearmont Street ...
The blockage resulted in a sanitary sewer overflow, causing untreated wastewater to spill into the storm sewer system at Spring Valley Road and John F. Kennedy Road.
According to the report, JXN Water spent $9,649,841.67 on sewer system needs between January 2024 through December 31, 2024. The budgeted amount was $8,480,000.01.
Estimated construction cost: $600,000 7. 48th Street NW sanitary sewer replacement. Project: Replacement of the sanitary sewer along 48th Street NW from Frazer Avenue to Yale Avenue NW. Estimated ...